Home / Process
How we build your casita, step by step
One team from the first parcel lookup to the final inspection, with a clear next step at every stage.
- Lot checkWe confirm whether the parcel is in Tucson, a town or unincorporated Pima County, then pull zoning, easements, HOA and septic status.
- Site visitWe measure, locate the sewer or septic, water and panel, check for caliche signs and access.
- Design and quoteA plan sized to the rules and your budget, and a written, itemized quote.
- EngineeringStructural, energy and cooling calculations for the permit set.
- HOA and permitsCommittee submittal where needed, then the city, town or county review and corrections.
- ConstructionTrenching, footings and slab, framing, systems, insulation, stucco, finishes.
- InspectionsWe book each one and clear anything the inspector flags.
- Final sign-offFinal inspection and approval to occupy the casita.
How long does a Tucson casita take?
It depends on the office, the type of unit and how many correction rounds the plans need. In 2023, a Tucson architect told the Arizona Daily Star the time before construction was running about six months. A model plan from the city library, a complete first submittal and quick answers to corrections all shorten that.
When do I see a price?
After the site visit and preliminary design, before anything is built. The quote is written and itemized. If the lot check turns up something that changes the scope, like caliche, a long sewer run or a panel upgrade, you hear about it then, not mid-build.
What should I have ready?
- The property address or parcel number.
- Any survey, past permits or plans for the house or garage.
- Your HOA's CC&Rs and design guidelines, if there is an HOA.
- How you plan to use the casita, and a rough budget.
Do you build in summer?
Yes. We schedule concrete pours and heavy outdoor work for early hours when it is hot, and plan around monsoon storms when roofing.
Ready for step one?
The lot check is free. Send your address to start.